| The upstairs walls are started and the bedroom and bathroom floors are in |
| The flat roof has been sloped, covered and painted with waterproof paint. The felt will go on later. |
| The back corner of the kitchen looking at the back wall of the bedroom. |
| The outside insulation and covering is on. |
| Closer to the insulation and mesh ready to take the render. |
| More scaffolding is up and the upstairs is taking shape. |
| Looking down from the scaffolding to the upstairs floor. |
| This scaffolding will be used to build the roof. |
| The bathroom wall at the front of the house with the hole for the window. The upstairs floor is chipboard but covered in a waterproof layer which is just as well as Friday was a deluge. |
| Nice view of the garden from the scaffolding. |
No comments:
Post a Comment