Week 4

It's been a bit of a stressful week this week but things have moved on.  Monday was bank holiday so peace and quiet for the day.  Tuesday and Wednesday were scheduled to have the overhead electricity supply moved underground.  This proved to be a huge operation.  The supply comes from a pole in the neighbour's garden so they had to have some of their patio lifted.  It also affected the neighbour attached to us as her electricity supply goes into our house, through our roof and to her meter.  The electricity co would not let us do that again so she had to have her drive and garden dug up and a cable put up the front of her house.  All of which she found extremely stressful.  So, the digging happened on Tuesday and then the next crew came on Wednesday to do the connections.  I had my electrician on hand.  All went reasonably well until it came to the connection of our neighbour's supply.  It seems her electricity is in a parlous state as she had no earth, her pipework was not bonded and her circuit breaker was not working.  The connection guys refused to connect to an unearthed circuit.  Panic!  In the end our electrician did a temporary bodge to provide an earth and the connection was completed.  Our neighbour was distraught and terrified of bills of hundreds of pounds to sort her electrical system.  I spent most of Thursday morning on the phone and think I have found a grant which can help pensioners keep their homes in a decent state of repair.  Hopefully, she will end up with a much safer system in the end but it has been painful getting there.

Thursday was about getting the drains in and the oversite ready for the buildings inspector.  He gave it the nod and the damp proofing membrane went in, followed by metal reinforcing bars and lastly concrete.  We now have the beginnings of a floor!  Paul and the kids have added some graffiti in the concrete which my deep conformism has been rather troubled by.

Digging a hole for the electricity cable.
How we used to get electricity.


The old wires going to the neighbour's pole.
It's all gone!

Aggregate in first
And at the back


The last of the spoil has gone so the front garden looks quite big now.


Aggregate tamped down (that was a bit noisy).

DPM on and metal reinforcements ready.

The concrete has arrived.

The first barrowful of our new floor.

Concrete being laid.

Making a beautiful smooth surface.

The first part of the floor is in.  Insulation, a concrete layer with the underfloor heating and a layer of screed to go on top of this. Mostly smooth apart from the graffiti (breathe deeply).