Monday, 22 July 2013

WEEK 14

Not much building work this week as we are waiting for the plumber to come.  The roof went onto the boiler house but otherwise the house was calm and empty of builders.  Paul and I have spent some hot days painting.  I am the emulsion queen and Paul is the king of windows.  Next week will again be quiet and then the plumber arrives to fit the bathroom, instal the boiler and test the underfloor heating.  Let's hope it isn't as hot as this week as we have to heat the floor slowly over a number of days!
The boiler house has a roof
The kitchen has the first layer of paint

The bathroom walls are painted.  They aren't red.  Thst's just the sun reflecting off my car!

Trying to decide what colour tiles to have around the bath

Thursday, 18 July 2013

Week 13

There are much more noticeable differences these days.  This week it is all about the inside.  We've had the doors on, the walls plastered and the floor downstairs has had the underfloor heating pipes put in and the screed laid on top.  This has created a lot of work for me and Paul as we haven't got the budget for painter/decorators!
Underfloor heating pipes on insulation

The concrete screed on top of the pipes

The cat jumped on it before it was dry!

The back doors are in

Screed and plaster waiting for me to paint the walls and ceiling

Gratuitous picture of the newest member of the household - this is Lola


Monday, 8 July 2013

Week 12

There has been some big milestones this week.  The scaffolding has come down and we have broken through downstairs.  Window sills have been added and the window surrounds have been rendered.  All the rooms are now plasterboarded waiting for the final layer of plaster next week.

The window is out and the wall about to come down.  There are sheets of ply on the other side to minimise the dust

The wall has gone!

Look no scaffolding

The side of the house sans scaffolding

My office

The ply went back on as we have no kitchen door at the moment

The kitchen with the opening to the old house and door to the office

Side of the house without scaffolding and with boiler house (although the boiler house is still roofless, doorless and boilerless)

Monday, 1 July 2013

Week 11

The windows are in!  Also, the bedroom and bathroom are plasterboarded and the boiler house has been started.  We've also broken through to the old house upstairs.  This involves ducking below a very low beam and I think we have all banged our heads already.

Looking up the stairs at the new opening
The new opening from the landing

The bathroom

The bedroom

Looking through the bedroom doorway to the opening

Windows in the front and a boiler shed at the side

The boiler shed

The boiler shed again

The bi-fold doors are almost painted