Thursday, 3 October 2013

Week 25

Its been a long time since I added anything as it all went very quiet for some weeks.  However, things are now moving on.  We have got the underfloor heating working and have laid the slabs in the big room.  The boiler is also pumping out lots of lovely hot water so we can use the new bathroom.  This has meant that Alan and co can move into the old kitchen and bathroom.  Paul and I spent a weekend carefully removing the old kitchen and setting it up as a temporary kitchen where the new one will eventually go.  The the guys came and ripped everything out.  They have blocked up old doors, opened new ones, removed and replaced ceilings (now with insulation in them!). 

The downstairs shower room is coming along and is in the process of being tiled.  We are using white metro tiles over all the walls which is very clean and bright but possibly a bit urinal like!

Oh, and we now have doors.  Pine was almost impossible to source at a reasonable price so we have oak and very well they look too.  We also have a back door but apparently a back doorstep is an optional extra so we have a big drop outside the door!

The old ceiling in the kitchen including some original lime plaster

Gary removing the bathroom

The new wall between the dining room and old kitchen

The kitchen part dismantled

More kitchen being taken apart


The old bathroom door has been filled in and a new opening made

The opening for the back door

The opening for the new back door (temporarily covered by a board) and the old entrance to the back porch (now blocked and plastered)


The new room with temporary kitchen

From the other end

Door to the study

The old dining room is slowly becoming the snug

Temporary kitchen

New back door (with 2ft drop!)

Downstairs shower room in process of being tiled

Door between old kitchen and old dining room



Monday, 26 August 2013

WEEK 19

It has been a while since I have added anything to the blog.  This is partly because we have been busy with puppy, school holidays, painting etc but also because the project has really slowed down.  We are waiting for the new bathroom to be operational and the boiler fitted so that we can move out of the old bathroom and kitchen and get to work on that.  This has been delayed by a busy plumber and a delay on getting the flooring sorted.  The floor is now in (we finally chose Marmoleum as it is a natural product rather than the very convincing, but still plastic, wood effect).  The tiles have been fitted and we just need hot water and the side on the bath.  The venetian blind has arrived but I have not yet fitted it.

We have finally taken the plastic off the glass in the folding doors and are very pleased with them.

The desk and shelves have also been fitted and the shelves are well on the way to being painted.  All the emulsion, with the exception of the last layer in the study has now been finished and all the windows have now had their final coats of paint.

The window in Paul's room has been installed and has made a huge difference to the stairwell as you are now greeted by a light room with a great view.

Oh, and the puppy has learnt to climb our vertiginous stairs.  Nothing is safe!

We can now see through the folding doors.  New sofa also (well new to me - a Multiyork sofa from Ebay complete with footstool)
Although it is currently a painting bench, this is actually a wooden kitchen worktop which will be the desks in the study
The shelves in the office.  These are now part way through the long and laborious painting process
The bathroom is on its way. I have now bought some towels which match a bit better!
Very pleased with the Ikea sink unit.
The view coming up the stairs is much lighter
Paul's new window
The view from Paul's new window









Monday, 22 July 2013

WEEK 14

Not much building work this week as we are waiting for the plumber to come.  The roof went onto the boiler house but otherwise the house was calm and empty of builders.  Paul and I have spent some hot days painting.  I am the emulsion queen and Paul is the king of windows.  Next week will again be quiet and then the plumber arrives to fit the bathroom, instal the boiler and test the underfloor heating.  Let's hope it isn't as hot as this week as we have to heat the floor slowly over a number of days!
The boiler house has a roof
The kitchen has the first layer of paint

The bathroom walls are painted.  They aren't red.  Thst's just the sun reflecting off my car!

Trying to decide what colour tiles to have around the bath

Thursday, 18 July 2013

Week 13

There are much more noticeable differences these days.  This week it is all about the inside.  We've had the doors on, the walls plastered and the floor downstairs has had the underfloor heating pipes put in and the screed laid on top.  This has created a lot of work for me and Paul as we haven't got the budget for painter/decorators!
Underfloor heating pipes on insulation

The concrete screed on top of the pipes

The cat jumped on it before it was dry!

The back doors are in

Screed and plaster waiting for me to paint the walls and ceiling

Gratuitous picture of the newest member of the household - this is Lola


Monday, 8 July 2013

Week 12

There has been some big milestones this week.  The scaffolding has come down and we have broken through downstairs.  Window sills have been added and the window surrounds have been rendered.  All the rooms are now plasterboarded waiting for the final layer of plaster next week.

The window is out and the wall about to come down.  There are sheets of ply on the other side to minimise the dust

The wall has gone!

Look no scaffolding

The side of the house sans scaffolding

My office

The ply went back on as we have no kitchen door at the moment

The kitchen with the opening to the old house and door to the office

Side of the house without scaffolding and with boiler house (although the boiler house is still roofless, doorless and boilerless)

Monday, 1 July 2013

Week 11

The windows are in!  Also, the bedroom and bathroom are plasterboarded and the boiler house has been started.  We've also broken through to the old house upstairs.  This involves ducking below a very low beam and I think we have all banged our heads already.

Looking up the stairs at the new opening
The new opening from the landing

The bathroom

The bedroom

Looking through the bedroom doorway to the opening

Windows in the front and a boiler shed at the side

The boiler shed

The boiler shed again

The bi-fold doors are almost painted