Monday, 26 August 2013

WEEK 19

It has been a while since I have added anything to the blog.  This is partly because we have been busy with puppy, school holidays, painting etc but also because the project has really slowed down.  We are waiting for the new bathroom to be operational and the boiler fitted so that we can move out of the old bathroom and kitchen and get to work on that.  This has been delayed by a busy plumber and a delay on getting the flooring sorted.  The floor is now in (we finally chose Marmoleum as it is a natural product rather than the very convincing, but still plastic, wood effect).  The tiles have been fitted and we just need hot water and the side on the bath.  The venetian blind has arrived but I have not yet fitted it.

We have finally taken the plastic off the glass in the folding doors and are very pleased with them.

The desk and shelves have also been fitted and the shelves are well on the way to being painted.  All the emulsion, with the exception of the last layer in the study has now been finished and all the windows have now had their final coats of paint.

The window in Paul's room has been installed and has made a huge difference to the stairwell as you are now greeted by a light room with a great view.

Oh, and the puppy has learnt to climb our vertiginous stairs.  Nothing is safe!

We can now see through the folding doors.  New sofa also (well new to me - a Multiyork sofa from Ebay complete with footstool)
Although it is currently a painting bench, this is actually a wooden kitchen worktop which will be the desks in the study
The shelves in the office.  These are now part way through the long and laborious painting process
The bathroom is on its way. I have now bought some towels which match a bit better!
Very pleased with the Ikea sink unit.
The view coming up the stairs is much lighter
Paul's new window
The view from Paul's new window